Division 1 -Requirements

01110
Summary of Work1/6/2009
01145Use of Premises1/6/2009
01230Alternates1/6/2009
01255Change Order Procedures1/6/2009
01270Measurement and Payment1/6/2009
01292Schedule of Values1/6/2009
01312Coordination and Meetings1/6/2009
01321Construction Photographs1/6/2009
01322Construction Photographs for Facility Projects1/6/2009
01325Construction Schedule1/6/2009
01326Construction Schedule (Bar Chart)1/6/2009
01330Submittal Procedures1/6/2009
01340Shop Drawings, Product Data, and Samples1/6/2009
01410TPDES Requirements (with Attachments)9/8/2009
01422Reference Standards1/6/2009
01450Contractor's Quality Control1/6/2009
01452Inspection Services1/6/2009
01454Testing Laboratory Services1/6/2009
01502Mobilization1/6/2009
01504Temporary Facilities and Controls1/6/2009
01506Diversion Pumping1/6/2009
01520Temporary Field Office1/6/2009
01555Traffic Control and Regulation1/6/2009
01562Tree and Plant Protection1/6/2009
01570Diverting Flow1/6/2009
01572Pollution Source Controls on Construction Projects1/6/2009
01573Managing Overland Flow1/6/2009
01574Trapping Sediment in Channelized Flow1/6/2009
01575Stabilized Construction Exit1/6/2009
01576Waste Material Disposal1/6/2009
01577Protecting Inlets1/6/2009
01578Control of Ground Water1/6/2009
01579Trapping Sediment During Site Dewatering1/6/2009
01580Project Identification Signs1/6/2009
01581Excavation in Public Way Permit Signs1/6/2009
01610Basic Product Requirements1/6/2009
01630Product Substitution Procedures1/6/2009
01725Field Surveying1/6/2009
01731Cutting and Patching1/6/2009
01732Procedure for Water Valve Assistance (with Attachments)1/6/2009
01733Procedure for New Water Line Disinfection1/6/2009
01740Restoration of Site Improvements1/6/2009
01755Starting Systems1/6/2009
01770Closeout Procedures1/6/2009
01782Operations and Maintenance Data1/6/2009
01785Project Record Documents9/8/2009